Mangement of vegitation along creek corridors to provide flood mitigation, stability, aesthetic and habitat benifits
|
|
|
Widening of watercourses
|
|
|
Construction of detention basins to temporarily store stormwater runoff and reduce the impacts of flooding on existing development
|
|
|
Improve the storm water system within the town area
|
|
|
Construct permanent levees along the rivers and creeks to contain floodwaters
|
|
|
Voluntary scheme to purchase residential property in high hazard areas
|
|
|
Provide funding or subsidies to raise houses above major flood level in low hazards areas
|
|
|
Specify controls on future development in flood-liable areas (e.g. controls on extent of filling, minimum floor levels)
|
|
|
Improve flood warning and evacuation procedures both before and during a flood
|
|
|
Community education, participation and flood awareness programs
|
|
|
Provide a Planning Certificate to purchasers in flood prone areas, stating that the property is flood affected
|
|
|