Bell Road Public Survey
*
1.
How frequently do you use Bell Road?
(Required.)
Daily
Weekly
Once or twice a month
Less than once a month
*
2.
Besides driving, what modes do you currently use to travel along Bell Road? (select all that apply)
(Required.)
Pedestrian purposes (walking / running / using a wheelchair or mobility scooter)
Biking
None, I only drive the corridor
Other (please specify)
*
3.
What’s the purpose of most of your trips along Bell Road?
(Required.)
To reach a specific destination or connect to an adjacent road
For recreation
*
4.
What is your greatest concern along the corridor?
(Required.)
Safety
Reaching my destination quickly
Aesthetics
Other (please specify)
*
5.
If there were a sidewalk along Bell Road, what mode of transportation would you be most likely to use?
(Required.)
Pedestrian purposes (walking / running / using a wheelchair or mobility scooter)
Biking
Other (please specify)
*
6.
If there were crosswalks along Bell Road, what location(s) would you prefer they be at? (please select all that apply)
(Required.)
63rd Street intersection
Lime Stone Road intersection
Other (please specify)
*
7.
Besides the sidewalk, are there any other amenities you’d like to see along Bell Road?
(Required.)
*
8.
Once the Bell Road sidewalk is complete, what other sidewalk or trail connections would you like to see nearby?
(Required.)