* 1. Which of the following Post-Construction Performance Requirements needs the most explanation in County design guidance?

Question Title

* 2. What tools have you found helpful for stormwater design, from either the County or other jurisdictions?

  Very Helpful Somewhat Helpful Not Helpful
Excel based calculator worksheets.
Approved formulas for calculations.
Commercially available software, such as HydroCAD.
Completeness checklists.
Standard details for stormwater control measures.
Approved planting palettes.
Lists of approved proprietary stormwater infrastructure.
Other?

Question Title

* 3. How valuable is PR #1 (Site Design and Runoff Reduction) in meeting other performance requirements of the PCRs (e.g., treatment and retention)?

Question Title

* 4. What can the County provide to help make PR #1 more valuable for compliance with treatment and retention requirements? (OPTIONAL)

Question Title

* 5. I would like to see the following topics have the most, least, or moderate amount of explanation in County design guidance:

  Most explanation Moderate explanation Least explanation
Self-treating areas
Self-retaining areas
Technical Infeasibility
Redevelopment Credit
Semi-pervious surfaces (compacted road base, synthetic turf, etc.)
Retention/Detention basins
Construction oversight and verification requirements.
Maintenance requirements
Runoff directed to vegetated areas

Question Title

* 6. The most significant challenge with implementing the PCRs during the project DESIGN phase is:

(Pick up to three choices)

Question Title

* 7. The most significant challenge with implementing the PCRs during the project CONSTRUCTION phase is:

(Pick up to three choices)

Question Title

* 8. Example project submittals would be helpful for me.

Question Title

* 9. Which stormwater control measures need clarification of County design expectations for onsite (private property) design?  Rank the following in order of importance, with 1 being most important and 4 being least important.

Question Title

* 10. Which stormwater control measures need clarification of County design expectations for offsite (right-of-way) design?  Rank the following in order of importance, with 1 being most important and 5 being least important.

Question Title

* 11. The differences between County’s flood control standards, drainage standards, and post-construction standards are:

Question Title

* 12. The County guidance for which drainage and stormwater related documents to submit for permit applications is:

Question Title

* 13. Rank the following in order of importance, with 1 being most important and 6 being least important.  I need guidance on these Post-Construction topics:

Question Title

* 14. What is one topic you think the County’s existing Post-Construction Handbook explains most effectively? (OPTIONAL)

Question Title

* 15. Where do you think the County’s existing Post-Construction Handbook is most lacking? (OPTIONAL)

Question Title

* 16. Other Comments? (OPTIONAL)

0 of 16 answered
 