Skip to content
SBC: Shaping Our Evaluation Criteria June 14, 2017
*
1.
There are many criteria we will use in the coming months to evaluate the relative value of Lincoln School project choices. Some of those criteria work well together, while some may be mutually exclusive. The School Building Committee is asking you to help us understand how the community currently feels about some of these criteria. Your feedback is critical to this process! Thank you for your help!
We should maintain the current "L-shaped" footprint of the school.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
2.
We should take a "blank slate" approach to the design (i.e. Consider possible changes to the footprint.)
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
3.
We should consider all new construction.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
4.
The primary focus of the project is a design that focuses on our educational vision.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
5.
The primary focus of the project is to make repairs and meet code.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
6.
The project should reach high energy efficiency standards.
(The 2008 Town Facilities Energy Performance Standard By-Law States: "Any town-owned buildings to be constructed or town-owned building undergoing major renovations shall be designed, to the extent practicable, as set forth below so that the fossil fuel-generated energy consumption of the buildings is reduced...by the percentage specified: 50% reduction by 2008; 55% reduction by 2010; 65% reduction by 2015; 80% reduction by 2020; 90% reduction by 2025; 100% reduction by 2030).
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
7.
Adding additional recreation fields is important.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
8.
Building safety and security are a primary consideration.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
9.
We need to minimize construction time.
(Required.)
Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
*
10.
Each of these criteria will have cost implications. Please put these criteria in order of their importance to you. 1 = this is my most important criteria, 2 = second most important criteria... 7 = least important
(Required.)
1
2
3
4
5
6
7
L-shaped footprint
Project design focuses on education
Project design focuses on repairs
Maximize energy efficiency
Additional recreation fields
Maximize safety and security features
Minimize construction time
11.
Are there other priorities that are important to you? Other committee or entities with whom we should collaborate? Do you have any other questions or comments for the SBC?
*
12.
How do you prefer to stay informed and involved? (Check all that apply)
(Required.)
Email
Lincoln Squirrel
FaceBook
Direct Mailings
Twitter
Lincoln Journal
Televised Meetings
Instagram
LincolnTalk
Other (please specify)
13.
Name
14.
Email Address
Name:
1 / 1
100%