• English
  • Español

Demonstration Project Background

Use the dropdown menu in the upper right corner to change the survey language.
Utilice el menú desplegable en la esquina superior derecha para cambiar el idioma de la encuesta.
Richfield Public Schools and the City of Richfield would like to hear from you about the demonstration project on East 70th St at Elliot Ave and 12th Ave S.

What is a demonstration project?
  • Temporary: this project will be removed before winter.
  • Low cost: this project uses affordable materials that can often be repurposed after the project is removed.
  • Goal: test and collect information on the demonstration project to evaluate how to make permanent changes that make walking and biking easier, safer, and more enjoyable for everyone. 

Below are examples of the demonstration project and what a permanent version of these changes might look like. 

Question Title

Curb Extension / "Bump Out"

Temporary curb extension at E 70th St and 12th Ave S in Richfield. This demonstration project consists of red paint on the pavement, white traffic tape, and white bollards.

Question Title

Permanent curb extension with ADA-compliant ramp

Question Title

Median with Crossing Enhancements

Temporary median crossing island consisting of white and yellow traffic tape, bollards, and a roadway diversion sign.

Question Title

Permanent median crossing island with rectangular rapid flashing beacons (RRFB)

Question Title

Bike Lane Enhancements

Two people ride bicycles through a protected bike lane that is part of a temporary demonstration project in Richfield.

Question Title

People riding bicycles on a permanent separated bikeway
The survey should take less than five minutes to complete. Your responses will remain confidential. We thank you for your time!

T